Barangaroo Metro
The Barangaroo Metro Station is located approximately 25 meters underground. During its construction phase, the contractors required a shoring solution for the challenging construction of stormwater pits within a tidal zone. Piling Solutions Australia’s engineering and product expertise was invaluable in assessing the conditions and providing the required temporary shoring using PSU18j steel pilings.


