Barangaroo Metro

The Barangaroo Metro Station is located approximately 25 meters underground.  During its construction phase, the contractors required a shoring solution for the challenging construction of stormwater pits within a tidal zone.  Piling Solutions Australia’s engineering and product expertise was invaluable in assessing the conditions and providing the required temporary shoring using PSU18j steel pilings.

Project Gallery

Need Steel Piling
Solutions?

We distribute
throughout Australia.

P.O. Box 342 Panania
NSW 2213